GENERATOR > INSTALLATION

for Preparation Click here



1. INSTALL GENERATOR ASSEMBLY


    A198911
  1. Temporarily install the generator assembly with the bolt.



    A198910E01
  1. Temporarily install the fan belt adjusting bar with bolt A and bolt B.

  1. Tighten bolt B with the generator assembly near the cylinder block.

    Torque:
    21 N*m{ 214 kgf*cm , 16 ft.*lbf }



    A201679
  1. Install the 2 brackets with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



    A198909
  1. Connect the connector and wire harness clamps.

  1. Install the terminal B with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Install the terminal cap.



2. INSTALL FAN AND GENERATOR V BELT
  1. Install the fan and generator V belt (Click here).



3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }